ABB IRB 6660 Product Manual page 328

Hide thumbs Also See for IRB 6660:
Table of Contents

Advertisement

4 Repair
4.7.2 Replacing the gearbox, axes 2- 3
Continued
11
12
13
14
15
16
17
Continues on next page
328
Action
Insert two screws, M12x50 in the holes to
neutralize the spring force. Screw in the
screws until they have proper contact with
the cylinder inside.
The length of the cylinder is now locked
and the balancing device is unloaded. It
should now be possible to easily rotate the
balancing device.
DANGER
Turn off all:
electric power supply
hydraulic pressure supply
air pressure supply
to the robot, before entering the robot
working area.
Drain the gearbox.
Remove the motor cables of axis-2 or axis-
3 motor, depending on which gearbox is
being removed. Protect the cables from
getting damaged and from oil spill.
Remove one gearbox at a time!
Remove the axis-2 or axis-3 motor, depend-
ing on which gearbox is being removed.
Remove all remaining attachment screws
that secure the gearbox to the lower arm
system.
Axis 2: M16 and M12.
Axis 3: M12.
© Copyright 2007-2018 ABB. All rights reserved.
Note
See the previous figure!
Detailed in section
Draining, axes 2 and 3
on page
151.
Note
Time-consuming activity!
Detailed in section
Replacing motors, axes
2 and 3 on page 281
xx1000001405
Product manual - IRB 6660
3HAC028197-001 Revision: S

Advertisement

Table of Contents
loading

This manual is also suitable for:

Irb 6660 - 100/3.3Irb 6660 - 130/3.1Irb 6660 - 205/1.9

Table of Contents