Keysight Technologies X Series Service Manual page 591

Exa signal analyzer, 9 khz - 3.6/7/13.6/26.5/32/44 ghz
Hide thumbs Also See for X Series:
Table of Contents

Advertisement

Assembly Replacement Procedures
Front Frame Assembly
Daughter Board, Interface Board and Keypad
Removal
1. Refer to
2. Remove the display. Refer to the
3. Refer to
4. Remove the thirteen screws securing the A1A2 Front Panel Interface board
5. To separate the keypad from the Front Panel Interface board, use a push
Replacement
1. Install the keypad onto the Front Panel Interface board using the pull
2. Install the A1A2 Front Panel Interface board/keypad assembly into the
3. Replace the A1A5 Front Panel Daughter board (14) by plugging it into the
4. Replace the display. Refer to the
5. Replace the RPG knob by firmly pressing it on.
Keysight N9010A EXA Service Guide
Figure
15-95. Remove the RPG knob (17) by carefully pulling it
off.
procedure.
Figure
15-93. Remove the A1A5 Front Panel Daughter board (14)
by removing the three screws (30) and unplugging it from the front panel
interface board.
to the Front Frame Assembly. The Front Panel Interface board with the
keypad attached can now be lifted from the Front Frame Assembly.
tool or pliers to carefully separate the pull through tabs.
through tabs and alignment holes. Use a push tool or pliers to ensure that
all of the pull through tabs are properly captive on the board.
Front Frame Assembly, and replace the thirteen screws to secure. Torque
to 9 inch-pounds.
Front Panel Interface board using the board to board connectors and
secure it with the three screws (30). Torque to 9 inch-pounds.
procedure.
Display Assembly - LED
Display Assembly - LCD
removal
replacement
591

Advertisement

Table of Contents
loading

Table of Contents