Assembly Replacement Procedures
RF Area (Option 503, 507, 513, 526)
3. Refer to
Figure 15-24
Installing New Coax Cables
4. Install W3 between J2 of the A13 Front End Assembly and J2 of the A11
5. Install W10 between the Type N input connector and the input of the A9
494
Figure
15-24. Install W9 between the output of the A10 Input
Attenuator and A11J1. Torque to 10 inch-pounds.
Low Band Switch. Torque to 10 inch-pounds.
Input Attenuator. Torque to 10 inch-pounds.
Keysight N9010A EXA Service Guide