General Information And Quality Notes; Measures For Maintaining Long−Term Body Protection; Prerequisite For Maintaining The Long−Life Guarantee; Electronic Control Modules - Porsche 996 TT Repair Manual

Table of Contents

Advertisement

5 General information and quality notes

Measures for maintaining long−term body protection

Electronic control modules

top of page
Measures for maintaining long−term body protection
Note
After repair work, the standard corrosion−inhibiting coating should only be restored with the
corrosion−inhibiting agents approved by the manufacturer. The following points must be observed for
body repairs.
Always apply welding primer to both sides of the welding flange when resistance spot welding.
Prime repair areas from outside. Prime on both sides in the accessible areas.
Seal all sheetmetal overlaps, sheetmetal edges, butt joints, weld seams etc. with body sealant.
When replacing structurally bonded body parts, proceed according to the information in the respective
repair instructions.
Only apply body sealant to primed sheetmetal parts.
Apply top coat paint to the inside of the outer sheetmetal shell before welding. See "Paint build−up":
Paint Manual
Build up paint on bright sheetmetal panels according to the painting methods described in the Paint
manual .
Repair or create standard undersealing by applying long−life undersealing material.
Preserve cavities in the repair area with cavity preservative after applying a top coat paint.
Check that the standard water drains (plugs) function correctly or clean them after the cavity
preservation material has dried.
Prerequisite for maintaining the long−life guarantee
All body repair work must be carried out correctly and according to the specific Porsche instructions for
sheetmetal, paint and corrosion protection/preservation work. To prevent jeopardising the long−life guarantee,
a Paint Condition Report is made out 2 years after delivery of the vehicle. This condition report must be
updated annually by every Official Porsche Centre.
top of page
Electronic control modules
Note
If electronic components, e.g. ABS control unit, have been removed for repair work and are then
reused, they must be given a functional check after fitting in accordance with existing specifications.
5 General information and quality notes
188

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents