Process
Process name
No.
16
Drying
17
Sanding (III)
Cleaning/ degreas-
18
ing
19
Top coat (I)
20
Leave unattended
21
Top coat (II)
22
Drying
23
Inspection
24
Masking removal
25
Parts installation
26
Bumper installation Install the bumper.
Front Bumper
Allow the coated surface to dry for 20 minutes at 20"C (68"F) [or 30 minutes at 60"C (140"F)].
Sand the coated surface and its surrounding areas using #400 sand paper and water.
Same as Process No. 12.
Non-colored
Use a "block" coating method.
• Recommended paint:
Suncryl (SC)
No. 307 Flex Hardener
SC Reducer (thinner)
• Mixing ratio:
Suncryl (SC) vs. No. 307 Flex Hardener = 3 : 1
• Viscosity: 11 — 13 sec./20"C (68"F)
• Coating film thickness: 40 — 50 #
• Spraying pressure: 245 — 343 kPa
2
(2.5 — 3.5 kg/cm
, 36 — 50 psi)
Not required.
Not required.
Allow the coated surface to dry for 2 hours at 20"C (68"F) or 30 minutes at 60"C (140"F).
NOTE:
Do not allow the temperature to exceed 80"C (176"F) since this will deform the PP substrate.
Carefully check the condition of the repaired area.
Remove the masking tape applied in Process No. 11 and 13.
Install parts on the bumper in reverse order of removal.
EI-36
Job contents
Metallic paint
Use a "block" coating method.
• Recommended paint:
Suncryl (SC)
No. 307 Flex Hardener
SC Reducer (thinner)
• Mixing ratio:
Suncryl (SC) vs. No. 307 Flex Hardener = 3 : 1
• Viscosity: 11 — 13 sec./20"C (68"F)
• Coating film thickness: 20 — 30 #
• Spraying pressure: 245 — 343 kPa
2
(2.5 — 3.5 kg/cm
, 36 — 50 psi)
Leave unattended at 20"C (68"F) for at least 10
minutes until the topcoated area is half-dry.
NOTE:
Be careful to keep dust or dirt from coming in
contact with the affected area.
Apply a clear coat three times at an interval of 3
to 5 minutes.
• Recommended paint:
SC710 Overlay Clear
No. 307 Flex Hardener
SC Reducer (thinner)
• Mixing ratio:
Suncryl (SC) vs. No. 307 Flex Hardener = 3 : 1
• Viscosity: 10 — 13 sec./20"C (68"F)
• Coating film thickness: 20 — 30 #
• Spraying pressure: 245 — 343 kPa
2
(2.5 — 3.5 kg/cm
, 36 — 50 psi)