Loader Arm Assembly Removal - Toro Dingo TX 413 Service Manual

Compact utility loader
Hide thumbs Also See for Dingo TX 413:
Table of Contents

Advertisement

HYDRAULIC LIFT ASSEMBLY
9. Install cable tie strap around all four hydraulic
hoses, approximately 8" (20.32cm) to the right of
the rear clamp (Fig. 285).
Figure 285
10. Start the unit and raise the loader arm. Remove
the jack stand. Continue operating the loader arm
up, down, and tilt to help purge the system of any
air. Check for any oil leaks at the hydraulic hose
connectors. After running the hydraulics, recheck
the oil reservoir; see the Maintenance Section,
Checking the Hydraulic Reservoir, page 3-4. Shut
the engine off.
11. Install the rear cover.
7-28

Loader Arm Assembly Removal

1. Remove the rear cover and belt cover.
2. Raise the loader arm assembly to the highest
position and install the cyclinder lock in the
hydraulic lift cylinder (Fig. 286).
DSC-1075
3. Remove the two hose clamps, located under the
loader arm assembly (Fig. 287).
Rev. 000
Figure 286
DSC-1041
Figure 287
DSC-1042
TX 413 Service Manual

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents