Flow of Test Run

Perform a test run of the inverter according to the following flow.
Item
Installation
Wiring and connections
Configuration of Ether-
CAT Slave/Units
Node Address Setting
Power-on
Display status checks
Parameter Initialization
Parameter setting
No-load run
M1 Series EtherCAT Type User's Manual (I670)
Description
Install the inverter according to the installation
conditions.
Connect the inverter to the power supply and pe-
ripheral equipment.
Sysmac Studio is used to create new projects and
slave/units configuration off-line or on-line.
Set the node address.
Check the points mentioned in the next page be-
fore turning the power supply ON.
Check that no error is occurring on the inverter.
Initialize inverter parameters.
Set the parameters required for the test run.
Run the motor in a no-load state.
5 Operation and Test Run
Reference
2-1-1 Inverter Installation on
page 2-2
2-3 Wiring on page 2-10
Sysmac Studio Version 1
Operation Manual (Cat. No.
W504)
3-1-1 Node Address Setting on
page 3-2
5-4 Operation Items for Test Run
on page 5-7
Section 9 Troubleshooting on
page 9-1
6-1 Data Initialization on page
6-3
6-3 Motor Parameter Settings on
page 6-17
6-4 RUN command on page
6-22
Section 6 Basic Settings on
page 6-1
5
5-5