Ag Leader Integra Display Operator's Manual page 179

Ag leader integra display
Table of Contents

Advertisement

You will now be returned to the Operation Configuration Wizard.
14. Select Implement
Select Implement from drop-down menu.
15. Select Planting Method
16. Select Speed Source
Use drop-down menu to select Primary Source, set Backup Source, and configure Auxiliary Channel.
Press Calibrate Speed Sensor to launch the Speed Sensor Calibration Wizard.
17. Enter Configuration Name
A suggested name for the configuration appears. If desired, Press
your configuration. Press
The complete configuration should now appear on the Configuration Setup screen and is now able to be
selected when starting a new Field Operation.
Note: After completing this configuration, in order for it to become active, you must adjust Seed Monitor
settings in Seed Monitor Setup.
Ag Leader PN 4002083 Rev. N
when complete.
P
LANTING
to enter a different name for
163

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Integra Display and is the answer not in the manual?

Questions and answers

Mark Wenzl
May 8, 2025

When planting with row shutoffs, and I start overlapping, my rows start to shutoff. When this happens the screen starts to alert and then throws up a check mark that I have to hit each time that I have to hit to get back to my mapping page. Is there away I can do away with this process and just have it alert me that the rows are shutting off

Subscribe to Our Youtube Channel

Related Products for Ag Leader Integra Display

Table of Contents

Save PDF