Inner 2way Tray-F1
Points to Note at Installation
Be sure to install this equipment after installing the 3 Way Unit.
Checking the contents
[1] Inner 2-way Tray X 1
[3] Screw (TP; M3x6) X 1
9
Installation > Inner 2way Tray-F1 > Installation Outline Drawing
[2] Insert Pin X 1
[4] Second Delivery
Full Detection Lever X 1
F-9-92
9
Installation > Inner 2way Tray-F1 > Installation Outline Drawing
Check Items when Turning OFF the Main Power
Chek that the main power switch is OFF
1) Turn OFF the main power switch.
2) Be sure that display in the Control Panel and the lamp of the main power supply are turned
off, then disconnect the power plug.
Installation Outline Drawing
9-43
F-9-93
9-43