Clean grain cross auger - Remove (K.60.B.51 - F.10.A.10)
1.
Open cover (1).
2.
Loosen nut (2) and remove the grain elevator inter-
mediate shaft drive belt.
3.
Rotate the elevator chain until the coupler links are
accessible on the bottom sprocket.
4.
Release the chain tension with nuts (1) and (2), at
the rear of the grain elevator.
CROP PROCESSING - STORING AND HANDLING Grain storing
2 4/7/2006
K.60.B / 18
1
ZDA4145A
2
ZDA3499A
3
ZDA2922A