New Holland CX720 Repair Manual page 3611

Hide thumbs Also See for CX720:
Table of Contents

Advertisement

Straw walker Bearing - Install (K.42.E.58.40 - F.10.A.15)
1.
Remove the grease of adapter sleeves (1) before
installation.
2.
Tighten nut (3) to a torque of 100 - 110 Nm. (74 - 81
ft.lbs ) and secure with locking washer (2).
NOTE: Check the bearing position related to the shaft col-
lar in Straw walker Bearing - Dimension (K.42.E.58.40
- D.40.A.30) or Straw walker Bearing - Dimension
(K.42.E.58.40 - D.40.A.30).
3.
The felt rings (1) must be steeped with engine oil.
Fill up bearing covers (2) with grease NLGI 2.
Tighten four nuts (3).
Next operation:
Install the straw walker shaft. Refer to Front shaft - Install (K.42.E.56 - F.10.A.15) / Rear shaft (K.42.E.57 -
F10.A.15).
CROP PROCESSING - SEPARATING Straw walker
2 4/7/2006
K.42.E / 21
1
ZDA4721A
2
ZDA4718A_1199
3
ZDA4624A

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cx740Cx760Cx780Cx820Cx840Cx860 ... Show all

Table of Contents