Return auger - Install (K.62.C.53 - F.10.A.15)
1.
Slide the right returns auger (1) into position behind
the clean grain elevator. During installation, ensure
the adjusting rod (2) is inserted into the mounting
frame (3).
Lineup the gearbox sheave to the cross auger
sheave using a straight edge.
Remove or install shim washers as necessary on
both sides of the gearbox sheave to achieve proper
alignment. (Maximum deviation - 2 mm (0.08 in.)
2.
Attach the discharge end of the auger to the combine
with cap screws and nuts (1) Do not tighten the hard-
ware.
Plug in the speed sensor connector (2).
3.
Install the support (1) using four cap screws and nuts
(2).
CROP PROCESSING - CLEANING Tailings return system
2 4/7/2006
K.62.C / 49
1
20013920_1314
2
20013921_1315
3
20013921_1316