4.
Remove cotter pin (2) to open coupler links (1).
5.
Attach a rope or fit a new chain to one side of the
grain elevator chain.
6.
Turn the old chain out.
CROP PROCESSING - STORING AND HANDLING Grain storing
2 4/7/2006
K.60.B / 26
4
ZDA4146A
5
ZDA3497A
6
ZDA3498A