ABB REG316 4 Series Operating Instructions Manual page 27

Numerical generator protection
Table of Contents

Advertisement

REG 316*4 1MRB520049-Uen / Rev. C
In the following figure the shorting links of the versions M12 and
M22 are shown:
Shorting links
4 terminal screws, 3 shorting links with offset and 1 flat shorting
link are supplied with every transformer.
The shorting links are placed in the recesses provided on the
universal terminals.
Versions M12 and M22:
First place the broken off shorting link with the opening down-
wards on terminal 11 and then fit 3 links one after the other.
Each one must be secured using one of the screws supplied.
Versions M13 and M23:
First place the broken off shorting link with the opening down-
wards on terminal 12 and then fit 2 links one after the other.
Each one must be secured using one of the screws supplied.
ABB Switzerland Ltd
Terminal screws
Shorting links
Universal terminals
Teminals 11 to 14
2-17

Advertisement

Table of Contents
loading

Table of Contents