Preventive Maintenance (Pm) - Toshiba e-STUDIO2006 Service Manual

Multifunctional digital systems
Hide thumbs Also See for e-STUDIO2006:
Table of Contents

Advertisement

7.

PREVENTIVE MAINTENANCE (PM)

7.1
General Description
Perform the preventive maintenance in the following timing.
every 55,000 sheets <20L/20H/23L/23H/25L/25H>
every 59,000 sheets <23LA/23LM/23HA>
every 64,000 sheets <28LM/28HA>
(1)
Preparation
Ask the user about the current conditions of the equipment and note them down.
Before starting maintenance, make some sample copies and store them.
Turn OFF the power and make sure to unplug the equipment.
(2)
Perform a preventive maintenance using the following checklist and illustrations.
(3)
Plug in the equipment after the maintenance has been finished. Then turn ON the power and
make some copies to confirm that the equipment is working properly.
(4)
After preventive maintenance, set the value of 08-6194 (Current value of PM counter Display) to
"0".
* This deletes the message "Time for maintenance".
© 2013-2017 TOSHIBA TEC CORPORATION All rights reserved
e-STUDIO2006/2306/2506/2007/2307/2507/2303A/2303AM/2803AM/2309A/2809A
7 - 1
PREVENTIVE MAINTENANCE (PM)
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents