MX2020 3D Universal Edge Router Hardware Guide
Installing the MX2020 DC Cable Manager
442
Figure 195: Installing the Standard Upper Cable Manager
NOTE:
To accommodate additional clearance, you may order an extended
DC cable manager from Juniper Networks.
To install the DC cable manager (see
Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect
1.
the strap to one of the ESD points on the chassis.
Position the DC cable manager over the two slots located on both sides of the DC
2.
PDM.
Lift the DC cable manager slightly up while inserting the two flanges into the slots on
3.
both sides of the DC PDM.
Push down to secure the DC cable manager in place.
4.
Figure 153 on page
304):
Copyright © 2015, Juniper Networks, Inc.