Installing an MX2020 Three-Phase Delta AC Power Distribution Module

Copyright © 2015, Juniper Networks, Inc.

Figure 165: Installing an SFB

0
OK/FAIL
Maintaining the MX2020 SFB on page 397
Removing an MX2020 SFB on page 495
Before you install a three-phase delta AC PDM, be aware of the following:
WARNING:
Before performing AC power procedures, disconnect all power
sources. To ensure that all power is off, locate the circuit breaker on the panel
board that services the AC circuit, switch the circuit breaker to the
position, and tape the switch handle of the circuit breaker in the
CAUTION:
To maintain proper cooling and prevent thermal shutdown of the
operating power supply unit, each PDM slot must contain either a PDM or a
blank panel. If you remove a PDM, you must install a replacement PDM or a
blank panel shortly after the removal.
Chapter 22: Installing and Replacing Components
19
OFF
position.
OFF
323