Installing The Mx2020 Extended Dc Cable Manager; Figure 201: Installing The Extended Lower Cable Manager - Juniper MX2020 Hardware Manual

3d universal edge router
Hide thumbs Also See for MX2020:
Table of Contents

Advertisement

MX2020 3D Universal Edge Router Hardware Guide

Installing the MX2020 Extended DC Cable Manager

448

Figure 201: Installing the Extended Lower Cable Manager

To install the extended DC cable manager (see
Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect
1.
the strap to one of the ESD points on the chassis.
Position the extended DC cable manager over the two slots located on both sides of
2.
the DC PDM.
Lift the extended DC cable manager slightly up while inserting the two flanges into
3.
the slots on both sides of the DC PDM.
Push the extended DC cable manager into place.
4.
Tighten the two captive screws to secure the extended DC cable manager.
5.
Figure 202 on page
449):
Copyright © 2015, Juniper Networks, Inc.

Advertisement

Table of Contents
loading

Table of Contents