Powering Off The Router; Powering Off The Ac-Powered Mx2020 Router - Juniper MX2020 Hardware Manual

3d universal edge router
Hide thumbs Also See for MX2020:
Table of Contents

Advertisement

CHAPTER 26

Powering Off the Router

Powering Off the AC-Powered MX2020 Router

Related
Documentation
Copyright © 2015, Juniper Networks, Inc.
Powering Off the AC-Powered MX2020 Router on page 527
Powering Off the DC-Powered MX2020 Router on page 528
NOTE:
After powering off a PSM, wait at least 60 seconds before turning it
back on.
To power off the router:
On the external management device connected to the CB-RE, issue the
1.
halt both-routing-engines
the Routing Engine cleanly, so their state information is preserved. If the router contains
only one CB-RE, issue the
user@host> request system halt both-routing-engines
Wait until a message appears on the console confirming that the operating system
2.
has halted. For more information about the command, see the
and Services Command Reference
Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect
3.
the strap to one of the ESD points on the chassis.
Move the AC power switch on the AC PSM faceplate for each AC PSM to the off (
4.
position.
Connecting the MX2020 Router to Management and Alarm Devices on page 275
Preventing Electrostatic Discharge Damage to an MX2020 Router on page 558
operational mode command. The command shuts down
command.
request system halt
.
request system
Junos OS System Basics
)
O
527

Advertisement

Table of Contents
loading

Table of Contents