Installing the MX2020 Upper Extended Cable Manager

446

Figure 199: Removing the Extended DC Cable Manager

D
The upper extended cable manager should be used with the extended craft interface to
allow for additional clearance.
To install the upper extended cable manager (see
Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect
1.
the strap to one of the ESD points on the chassis.
If necessary, remove the extended craft interface as described in
2.
MX2020 Extended Craft Interface" on page
Position the upper extended cable manager on the studs below the location of the
3.
craft interface.
Attach the upper extended cable manager using eight screws as shown in
4.
Figure 200 on page
447.
Replace the cable manager cover, and secure it with the two captive screws.
5.
Install the extended craft interface as described in
6.
Craft Interface" on page
Figure 200 on page
452.
300.
447):
"Removing an
"Installing an MX2020 Extended