Lenel OnGuard Hardware Installation Manual page 129

Table of Contents

Advertisement

Supervised F/2F Wiring (Reader Port 2) Callouts
Callout
Description
1
Supervised F/2F reader
2
TB3 and TB4 on LNL-2210
3
For Supervised F/2F readers: Install jumper between D1 and LED terminals.
4
TB4-1: +12 VDC connections
5
TB3-2: Buzzer terminal to Reader DO (GREEN LED) connection
6
TB3-3: Reader Data 1 connection
7
TB4-2: Ground connection
Typical Supervised F/2F Board Edge Inputs
When the "Supervised F/2F Board Edge Inputs" Output type is configured in System Administration, then
door contact and REX are terminated on the LNL-2210 inputs.
Supervised F/2F Wiring (Reader Port 2)
2
3
Hardware Installation Guide
4
5
6
7
1
129
revision 7 —

Advertisement

Table of Contents
loading

Related Products for Lenel OnGuard

Table of Contents