Replacing The Front Vga Connector; Required Tools; Preliminary Steps - Fujitsu PRIMERGY TX300 S7 Upgrade And Maintenance Manual

Table of Contents

Advertisement

13.3.3 Replacing the front VGA connector

Upgrade and Repair Units (URU)
Average task duration: 15 minutes

13.3.3.1 Required tools

Preliminary and concluding steps: tool-less
Replacing the front VGA connector:
– Wrench key for UNC #4-40 hexagon bolts

13.3.3.2 Preliminary steps

Before replacing the front VGA connector, perform the following steps:
Ê Disable BitLocker functionality as described in section
functionality" on page
Ê Locate the desired server as described in section
server" on page
Ê Shut down the server as described in section
page
71.
Ê Remove the AC power cords from the PSU cable brackets and disconnect
them from the system as described in section
from the mains" on page
Ê When working on a rack-mounted server, extend it out of the rack as
described in section
If further required, remove the server from the rack as described in section
"Removing the server from the rack" on page
Ê Bring the server to its horizontal position.
Ê Open the side / top cover as described in section
on page 79
(rack server) or
server).
TX300 S7 / RX350 S7
141.
64.
72.
"Extending the server out of the rack" on page
"Removing the side cover" on page 88
Upgrade and Maintenance Manual
Front panel and external connectors
"Locating the defective
"Shutting down the server" on
"Disconnecting the server
77.
"Removing the top cover"
"Disabling BitLocker
76.
(tower
809

Advertisement

Table of Contents
loading

This manual is also suitable for:

Primergy rx350 s7

Table of Contents