Removing Processors; Required Tools; Preliminary Steps - Fujitsu PRIMERGY TX300 S7 Upgrade And Maintenance Manual

Table of Contents

Advertisement

11.3

Removing processors

Upgrade and Repair Units (URU)
Average hardware task duration: 15 minutes
Average software task duration: 5 minutes
V
CAUTION!
Processors are extremely sensitive to electrostatic discharge and must
be handled with care. After a processor has been removed from its
protective sleeve or from its socket, place it upside down on a
nonconducting, antistatic surface. Never push a processor over a
surface.

11.3.1 Required tools

Preliminary and concluding steps: tool-less
Removing and installing the processor heat sink:
– Phillips PH2 / (+) No. 2 screw driver
Removing the processor: tool-less

11.3.2 Preliminary steps

Before removing a processor, perform the following steps:
Ê Disable BitLocker functionality as described in section
functionality" on page
Ê Disable boot watchdog functionality as described in section
SVOM boot watchdog functionality" on page
Ê Shut down the server as described in section
page
71.
TX300 S7 / RX350 S7
141.
Upgrade and Maintenance Manual
"Disabling BitLocker
"Disabling
142.
"Shutting down the server" on
Processors
617

Advertisement

Table of Contents
loading

This manual is also suitable for:

Primergy rx350 s7

Table of Contents