Installing A Bbu; Required Tools; Preliminary Steps - Fujitsu PRIMERGY TX300 S7 Upgrade And Maintenance Manual

Table of Contents

Advertisement

Expansion cards and backup units
9.7.2

Installing a BBU

Upgrade and Repair Units (URU)
Average task duration: 5 minutes
V
CAUTION!
For further safety information, please refer to chapter
information" on page
9.7.2.1

Required tools

Preliminary and concluding steps: tool-less
Installing a BBU: tool-less
9.7.2.2

Preliminary steps

Before installing a BBU, perform the following steps:
Ê Disable boot watchdog functionality as described in section
SVOM boot watchdog functionality" on page
Ê Shut down the defective server as described in section
server" on page
Ê Remove the AC power cords from the PSU cable brackets and disconnect
them from the system as described in section
from the mains" on page
Ê When working on a rack-mounted server, extend it out of the rack as
described in section
If further required, remove the server from the rack as described in section
"Removing the server from the rack" on page
Ê Open the side / top cover as described in section
on page 79
(rack server) or
server).
Ê Remove the air duct as described in section
on page
100.
542
51.
71.
72.
"Extending the server out of the rack" on page
"Removing the side cover" on page 88
Upgrade and Maintenance Manual
"Important
"Disabling
142.
"Shutting down the
"Disconnecting the server
77.
"Removing the top cover"
"Removing the system air duct"
TX300 S7 / RX350 S7
76.
(tower