13.2.2.4 Concluding steps
"Installing the front panel module" on page 440
Ê
"Installing the system fan holder" on page 94
Ê
"Installing the system air duct" on page 92
Ê
"Reassembling" on page 74
Ê
"Connecting the power cord" on page 87
Ê
"Switching on the server" on page 90
Ê
"Resuming BitLocker functionality" on page 136
Ê
13.2.3 Replacing the front VGA connector
Upgrade and Repair Unit
(URU)
Tools: – Phillips PH0 / (+) No. 0 screw driver
– Side cutter (for cable tie)
13.2.3.1 Preliminary steps
"Suspending BitLocker functionality" on page 111
Ê
"Locating the defective server" on page 55
Ê
"Shutting down the server" on page 58
Ê
"Disconnecting the power cord" on page 59
Ê
"Getting access to the component" on page 61
Ê
"Removing the system air duct" on page 91
Ê
"Removing the system fan holder" on page 93
Ê
"Removing the front panel module" on page 437
Ê
13.2.3.2 Removing the defective front VGA connector
Ê Remove the front VGA connector as described in section
front VGA connector" on page
TX2560 M2 / RX2560 M2
Front panel and external connectors
446.
Upgrade and Maintenance Manual
Hardware: 15 minutes
"Removing the
449