Ê Reconnect the AC power cords to the power supply units and secure them
with PSU cable brackets as described in section
the mains" on page
Ê Enable boot watchdog functionality as described in section
boot watchdog functionality" on page
Ê If BitLocker functionality is used and has been disabled before starting the
maintenance task, re-enable BitLocker as described in section
BitLocker functionality" on page
14.2.1.5 Software configuration
The UFM delivery set includes the "Recovery Tool CD" to setup the ESXi
configuration. Proceed as follows:
Ê Switch on the server.
Ê Right after switching on the server, insert the "Recovery Tool CD" into the
DVD drive and close the drive tray.
Ê The server should now boot from the "Recovery Tool CD".
Ê Follow the on-screen instructions.
14.2.2 Removing the UFM board
Upgrade and Repair Units (URU)
Average task duration: 5 minutes
14.2.2.1 Required tools
Preliminary and concluding steps: tool-less
●
Removing the UFM:
●
– Phillips PH1 / (+) No. 1 screw driver
TX300 S7 / RX350 S7
133.
165.
Upgrade and Maintenance Manual
System board and components
"Connecting the server to
159.
"Enabling SVOM
"Enabling
823