Upgrading Or Replacing Processors; Required Tools - Fujitsu PRIMERGY TX300 S7 Upgrade And Maintenance Manual

Table of Contents

Advertisement

Ê Reconnect the AC power cords to the power supply units and secure them
with PSU cable brackets as described in section
the mains" on page
Ê If available, update the system board BIOS and the iRMC to the latest
version as described in section
BIOS and iRMC" on page
Ê Enable boot watchdog functionality as described in section
boot watchdog functionality" on page
Ê If BitLocker functionality is used and has been disabled before starting the
maintenance task, re-enable BitLocker as described in section
BitLocker functionality" on page
11.4

Upgrading or replacing processors

Field Replaceable Units (FRU)
Average hardware task duration: 15 minutes
Average software task duration: 5 minutes
V
CAUTION!
Processors are extremely sensitive to electrostatic discharge and must
be handled with care. After a processor has been removed from its
protective sleeve or from its socket, place it upside down on a
nonconducting, antistatic surface. Never push a processor over a
surface.

11.4.1 Required tools

Preliminary and concluding steps: tool-less
Removing and installing the processor heat sink:
– Phillips PH2 / (+) No. 2 screw driver
Upgrading or replacing the processor: tool-less
TX300 S7 / RX350 S7
133.
"Updating or recovering the system board
147.
165.
Upgrade and Maintenance Manual
"Connecting the server to
159.
Processors
"Enabling SVOM
"Enabling
629

Advertisement

Table of Contents
loading

This manual is also suitable for:

Primergy rx350 s7

Table of Contents