Altigen ACM 6.7 Administrator's Manual page 379

Max communication server
Table of Contents

Advertisement

If the board configuration for the default gateway is changed, or the license for the
SIP-Trunk is changed, you must reboot both the primary and secondary systems to
make the change take effect. The correct order for reboot is: 1) shut down inactive
system; 2) shut down active system; 3) start active system; 4) start the inactive
system.
HMCP installed with Softswitch is not supported if VLAN is used. This is because to
run HMCP, VLAN needs one additional NIC but redundancy supports only two NICs.
If the active system needs to be shut down for maintainance, control must be
manually switched from the active system to the standby system first.
MAXCS ACM 6.7 Administration Manual 365
Limitations

Advertisement

Table of Contents
loading

Table of Contents