Post-Installation Checklist; Table 6-1. Post-Installation Checklist - Tekelec T1000 Hardware Manual

Tekelec 1000 application server hardware manual
Table of Contents

Advertisement

Post-Installation Checklist

After you have performed installation procedures in this manual, fill out the
checklist shown in Table 6-1.
Table 6-1.
Check
When
Done
910-0095-001 Revision J November 2007
Post-Installation Checklist
All items listed in the Equipment Specification have been installed.
Shipping container is properly packed with ramp and frame dollies and shipped to
Tekelec.
This check applies only after a heavy duty frame has been installed.
The site is clean.
Systems are neat, clean, and level.
All cable connections are checked to ensure a tight and complete connection.
Cabling is neatly installed and the labels are correct and easily readable.
Power cabling does not run through a cable rack.
Power cabling is not routed together with any other cables and has at least six inches
of clearance.
Racks have protective paper between the rack and any cables that would otherwise
touch the rack.
The main ground cable is correctly labeled and is marked "TO and "FROM" with the
"Do Not Remove" tag installed on both ends of the cable at the grounding.
The -48 VDC power feeds are correctly labeled at the site power distribution panel.
There should be an A feed and a B feed for each breaker panel.
This check applies only in a DC environment.
The rectifier is plugged in to the AC power source.
This check applies only in an AC environment.
Any -48 VDC BATT and RTN cables are correctly labeled.
Earthquake bracing, if any, is properly installed.
Adequate floor clearances have been maintained.
Panels, if any, are correctly installed.
Cable sheets are properly filled out.
Documentation has been received and is properly stored.
Modems, if any, are operational.
Post-Installation Checklist