Post Installation Procedures
How to Verify the Ground in an AC Environment
Use the following procedure to o verify ground in an AC environment.
1. Take the black lead of a VOM and insert it into the ground post on the AC source plug/outlet
being tested.
2. Take the red lead of the VOM and insert it into one of the hot sides of the plug/outlet.
The meter should now read 208 VDC.
3. While keeping the black lead in place, remove the red lead from the branch it was inserted into
Step 2
in
on page 94 and insert it into the other branch of the outlet/plug.
Again the meter should read 208 VDC.
4. This procedure is complete.

Post-Installation Checklist

After you have performed installation procedures in this manual, fill out the checklist shown in

Table 8: Post-Installation Checklist

Table 8: Post-Installation Checklist
Check When Done
94
on page 94.
All items listed in the Equipment Specification
have been installed.
Shipping container is properly packed with
ramp and frame dollies and shipped to Tekelec.
Note: This check applies only after a heavy
duty frame has been installed.
The site is clean.
Systems are neat, clean, and level.
All cable connections are checked to ensure a
tight and complete connection.
Cabling is neatly installed and the labels are
correct and easily readable.
Power cabling does not run through a cable
rack.
Hardware Manual
Verify that:
910-2969-001 Revision K, June 2009