How to Prepare the Floor for Heavy Duty Frames

Frame layout is site specific; Figure 4-1 on page 4-4 shows the most typical frame
layout. The recommended minimum aisle spacing is 3 ft. (91.5 cm) front and rear.
The following subsections provide instructions on marking the floor layout and
preparing raised floors.
How to Mark the Floor Layout
Use the following procedure to mark the floor layout.
Procedure 4-2.
1.
Verify with a customer representative that the required area dimensions and
equipment location correspond with the marked floor plan.
2.
Use the floor plan provided with the engineering site file specifications to
mark the front base line and the borders of the first frame with the chalk line.
3.
Align the frame template (isolator pad) with either of the two sides marked
"This side front" along the front chalk line. Using a felt tip pen, mark Anchor
locations in the middle of each oval anchor slot. Mark the corners of the first
frame as shown in Figure 4-1.

Figure 4-1. Floor Marking Template for HD Frame

12 inch minimum
from existing telco
equipment
Chalk lines defining front
and starting end of lineup
4-4
Mark Floor Layout
Rear
Slots
First
template
position
This side front
Front
25 7/8
inches
Second
template
position
6 inches spacing
Chalk line
910-0095-001 Revision J November 2007
23 5/8
inches
04_floor_mounting_template