Recommended Tools - Tekelec T1000 Hardware Manual

Tekelec 1000 application server hardware manual
Table of Contents

Advertisement

To install and anchor a heavy duty frame, perform the following tasks:
• Prepare the floor. See page 4-4.
• Anchor the frame to the floor. See page 4-6.
NOTE: The anchoring procedure and the anchor assembly to use
depend on the type of floor on which the frame is to be installed.
• Anchor the frame to the ceiling using an overhead rack. See page 4-17.

Recommended Tools

All Tekelec tools should be labeled "Property of TEKELEC" with either a press-on
Field Tool Identification label (P/N 658-0941-01) or Field Tool Identification wrap
(P/N 658-0941-02).
• Safety glasses
• Ear protectors
• Mounting hardware kit (P/N 840-0092-01)
• Isolator pad (in mounting hardware kit), also used as template
• Chalk (or chalk line)
• Fiberglass tape measure
• Felt tipped marking pen
• Rotary impact drill
• 18 mm (11/16 inch) masonry drill-bit
• 1 inch (25.4 mm) masonry drill-bit
• Extension cord
• High Efficiency Particulate Air (HEPA) vacuum cleaner
• Masking tape
• File
• 3/4 inch (19mm) box-end wrench
• 3/4 inch (19mm) socket wrench
• Carbide-toothed hole saw
• Sub-floor marking tool (star bit)
• Hammer
910-0095-001 Revision J November 2007
How to Install a T1000 AS Frame
4-3

Advertisement

Table of Contents
loading

This manual is also suitable for:

1000

Table of Contents