Figure 4-3. Anchor Installation of HD Frame into Slab Floor
Anchor
(4 places)
Large steel
washer
Round fiber
(insulator)
washer
Square
metal washer
Qty=3
8.
Tighten the top nut of the anchor assembly with a socket wrench until the
twist off nut above the plastic red cover breaks free. Leave the twist off nut on
the threaded rod to indicate that the torque on the nut beneath has been set
properly.
9.
This procedure is complete.
Next, go to Procedure 4-8, "Attach Overhead Rack Support," on page 4-18.
910-0095-001 Revision J November 2007
Isolation pad
How to Install a T1000 AS Frame
Bottom of Frame
and isolator pad
4-9