T1000 As Chassis Installation And Replacement; Figure 3-6. T1000 As Status Indicators - Tekelec T1000 Hardware Manual

Tekelec 1000 application server hardware manual
Table of Contents

Advertisement

Figure 3-6. T1000 AS Status Indicators

Alarm Indicators
Status Indicators
For more information about the diagnostics that manage these alarm and status
indicators, see "T1000 AS Diagnostics" on page A-6.

T1000 AS Chassis Installation and Replacement

The T1000 AS chassis is installed in the frame using slides that have inner and
outer rails. The outer slide rail is attached to the frame and the inner slide rail is
attached to the T1000 AS chassis (see Figure 5-1 on page 5-3). The chassis is
installed by sliding the inner rails into the outer rails.
DANGER: Moving a T1000 AS chassis requires two people. Each T1000 AS
chassis weighs approximately 30 kg (65 lbs) and may cause personnel injury or
damage to the internal components due to shock and vibration if not handled
properly.
The Tekelec 1000 chassis is also field replaceable. Tekelec 1000 replacement,
including disconnecting cables, mounting a replacement system (of identical
configuration), and reconnecting cables requires no more than 30 minutes.
NOTE: All I/O connections are at the rear of the Tekelec 1000 chassis.
Table 3-1 lists the dimensions of the Tekelec 1000 chassis.
910-0095-001 Revision J November 2007
Power Indicators
T1000 AS Hardware Features
3-9