5. Measure resistance between the terminals of the
input/turbine speed sensor.
• If not as specified, replace the input/turbine
speed sensor.
Resistance
250600 ohms (ATF temperature: 40160
° ° ° ° C {40320 ° ° ° ° F})
6. Connect the input/turbine speed sensor
connector.
7. Install the air cleaner component. (See
INTAKE-AIR SYSTEM REMOVAL/
INSTALLATION.)
8. Install the battery and battery tray.
9. Connect the negative battery cable.
End Of Sie
INPUT/TURBINE SPEED SENSOR REMOVAL/INSTALLATION
1. Disconnect the negative battery cable.
2. Remove the battery and battery tray.
3. Remove the air cleaner component. (See
4. Disconnect the input/turbine speed sensor
connector.
5. Remove the input/turbine speed sensor.
6. Apply ATF to a new O-ring and install it on a new
input/turbine speed sensor.
7. Install the input/turbine speed sensor.
Tightening torque
811 N·m {82112 kgf·cm, 7197 in·lbf}
8. Connect the input/turbine speed sensor
connector.
9. Install the air cleaner component. (See
INTAKE-AIR SYSTEM REMOVAL/
INSTALLATION.)
10. Install the battery and battery tray.
11. Connect the negative battery cable.
End Of Sie
VEHICLE SPEEDOMETER SENSOR (VSS) INSPECTION
Visual Inspection
1. Remove the VSS. (See
2. Make sure that the sensor is free of any metallic shavings or particles.
• If any are found on the sensor, clean them off.
3. Install the VSS. (See
Wave profile Inspection
1. Remove the PCM. (See
2. Connect WDS or equivalent to DLC connector.
3. Connect osilloscope test leads to the following PCM connector terminals.
• (+) lead: PCM terminal 3C
• (-) lead: PCM terminal 1D
4. Start the engine.
5. Monitor VSS PID.
K24
AUTOMATIC TRANSAXLE
F10
F10 INTAKE-AIR SYSTEM
F10
K26 VEHICLE SPEEDOMETER SENSOR (VSS)
K26 VEHICLE SPEEDOMETER SENSOR (VSS)
F43 PCM
REMOVAL/INSTALLATION.)
REMOVAL/INSTALLATION.)
REMOVAL/INSTALLATION.)
REMOVAL/INSTALLATION.)
A6E5614W031
A6E561421550W04
A6E5614W030
A6E561401030W05