Oil Cooler Removal/Installation - Mazda 6 2002 Workshop Manual

Hide thumbs Also See for 6 2002:
Table of Contents

Advertisement

OIL COOLER REMOVAL/INSTALLATION

1. Disconnect the negative battery cable.
2. Drain the ATF into a container. (See
3. Remove the radiator. (See
4. Remove in the order indicated in the table.
5. Install in the reverse order of removal.
6. Add ATF to the specified level. (See
7. Connect the negative battery cable.
8. Inspect for oil leakage from the oil pipes and oil hoses.
9. Inspect for coolant from the hoses.
10. Inspect the ATF level and condition. (See
11. Carry out the line pressure test. (See
12. Carry out the road test. (See
WITH OIL COOLER
.
1
Oil hose
(See
K–40 Oil Pipe, Hose Clamp, Oil Hose
Installation
Note.)
2
Hose clamp
(See
K–40 Oil Pipe, Hose Clamp, Oil Hose
Installation
Note.)
AUTOMATIC TRANSAXLE
K–13 AUTOMATIC TRANSAXLE FLUID (ATF)
E–6 RADIATOR
REMOVAL/INSTALLATION.)
K–13 AUTOMATIC TRANSAXLE FLUID (ATF)
K–12 AUTOMATIC TRANSAXLE FLUID (ATF)
K–6 MECHANICAL SYSTEM
K–9 ROAD
TEST.)
TEST.)
3
Oil cooler
4
Connector bolt
5
O-ring
6
Radiator (in tank oil cooler)
(See
K–40 Radiator (In Tank Oil Cooler) Installation
Note.)
A6E561419900W02
REPLACEMENT.)
REPLACEMENT.)
INSPECTION.)
A6E5614W069
K–39
K

Advertisement

Table of Contents
loading

This manual is also suitable for:

6

Table of Contents