QFX10000 Site Preparation Checklist
Table 47: Site Preparation Checklist
Item or Task
For More Information
Environment
Verify that
"QFX10000 Environmental Requirements and Specifications" on
environmental
page 117
factors such as
temperature
and humidity do
not exceed
switch
tolerances.
Power
Measure the
distance
between
external power
sources and the
switch
installation site.
Copyright © 2019, Juniper Networks, Inc.
QFX10000 Site Preparation Checklist on page 115
QFX10008 Site Guidelines and Requirements on page 117
QFX10008 Power Planning on page 124
QFX10000 Transceiver and Cable Specifications on page 130
QFX10000 Console and Management Cable Specifications and Pinouts on page 135
The checklist in
Table 47 on page 115
preparing a site for a QFX10008 or a QFX10016 installation.
summarizes the tasks you need to perform when
Performed By
Date