Juniper QFX10008 Hardware Manual page 116

Hide thumbs Also See for QFX10008:
Table of Contents

Advertisement

QFX10008 Switch Hardware Guide
Table 47: Site Preparation Checklist (continued)
Item or Task
For More Information
Calculate the
"QFX10000 AC Power Specifications" on page 53
power
"QFX10000 DC Power Specifications" on page 61
consumption
and
"QFX10008 Power Planning" on page 124
requirements.
Rack
Verify that your
"QFX10000 Rack Requirements" on page 119
rack meets the
minimum
requirements
for the
installation of
the switch.
Plan rack
"QFX10000 Clearance Requirements for Airflow and Hardware
location,
Maintenance" on page 121
including
required space
clearances.
Secure the rack
to the floor and
building
structure.
Cables
Acquire cables
The list of supported transceivers for the QFX10008 line cards is
and connectors:
located at
https://pathfinder.juniper.net/hct/product/#prd=QFX10008
Determine
and for the QFX10016 line cards at
the number
https://pathfinder.juniper.net/hct/product/#prd=QFX10016
of cables
needed
based on
your planned
configuration.
Review the
maximum
distance
allowed for
each cable.
Choose the
length of
cable based
on the
distance
between the
hardware
components
being
connected.
116
Performed By
Date
.
Copyright © 2019, Juniper Networks, Inc.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Qfx10016

Table of Contents