CHAPTER 2
Site Planning, Preparation, and
Specifications
Site Preparation Checklist for an EX4600 Switch
Table 20: Site Preparation Checklist
Item or Task
Environment
Verify that environmental factors such as
temperature and humidity do not exceed switch
tolerances.
Power
Measure the distance between external power
sources and switch installation site.
Calculate the power consumption and
requirements.
Rack or Cabinet
Verify that your rack or cabinet meets the
minimum requirements for the installation of the
switch.
Plan rack or cabinet location, including required
space clearances.
Copyright © 2019, Juniper Networks, Inc.
The checklist in
preparing a site for EX4600 switch installation.
For More Information
"Environmental Requirements and
Specifications for EX Series
Switches" on page 46
"AC Power Specifications for an
EX4600 Switch" on page 39
summarizes the tasks you need to perform when
Performed By
Date
45