OC-3/12/48 ring setup and testing: integration
procedures
........................................................................................................................................................................
................................................................................................................................................
22
Verify proper communications with the adjacent Alcatel-Lucent 1665 DMX nodes.
Administration>OSI Neighbor Map.
Result:
................................................................................................................................................
23
Perform steps in this procedure on all adjacent nodes in the ring.
................................................................................................................................................
24
After all connections and tests have been made, verify optical fiber cables are placed in
fiber tray and properly routed in bay framework.
................................................................................................................................................
25
Reconnect the office alarm cable disconnected in
................................................................................................................................................
26
Check off the appropriate box in
E
O
N D
........................................................................................................................................................

Optical transmission test (OC-192, OC-48, OC-12)

Overview
The following test verifies error-free transmission between nodes.
Transmission test procedure
................................................................................................................................................
1
At the test location, select Performance > View PM Reports > OCn Section...
................................................................................................................................................
2
Choose CP main-1, Port 1
................................................................................................................................................
3
Click Select.
................................................................................................................................................
4
Select Time Period: 15-Min, Monitored Date: Current Date and Monitor Level: 0 UP.
........................................................................................................................................................................
Alcatel-Lucent 1665 DMX R9.0
365-372-304R9.0 Issue 2
July 2010
The adjacent node appears in the neighbor list.
S
F
T E P S
Optical transmission test (OC-192, OC-48, OC-12)
Step
1.
Table I-3, Installation acceptance
checklist.
8 - 9