Manual Switching Tests - Alcatel-Lucent 1665 Installation Manual

Data multiplexer
Hide thumbs Also See for 1665:
Table of Contents

Advertisement

Operational tests
........................................................................................................................................................................
Result:
FAULT LED should flash on the OLIU.
................................................................................................................................................
12
Click Refresh in the View Protection window.
Result:
now).
................................................................................................................................................
13
Reconnect the fiber at the OLIU.
Result:
FAULT LED on the OLIU should extinguish.
................................................................................................................................................
14
Repeat
active.
................................................................................................................................................
15
Check off the appropriate box in
E
O
N D
........................................................................................................................................................

Manual switching tests

Description
This test will initiate switching commands from the CIT and verify proper switching and
LED indications.
Main OLIU switching test
Note:
................................................................................................................................................
1
Select Fault > Protection Switch.
................................................................................................................................................
2
Under Path Protection choose Path m-1-1.
*
Only if the ASAP has been set back to "Default".
........................................................................................................................................................................
Alcatel-Lucent 1665 DMX R9.0
365-372-304R9.0 Issue 2
July 2010
*
The MN
and then NE alarm LED should light on the SYSCTL and the
The Active path has changed. (If m1-1-1 was active before, m2-1-1 is active
After a short time, the MN
Step 10
through
Step 13
S
F
T E P S
An STS-1 cross-connect should still exist from the previous tests.
*
and NE alarm LEDs on the SYSCTL and the
to verify a switch back to the OLIU that was originally
Table I-3, Installation acceptance
Manual switching tests
checklist.
7 - 9