Installing The Fiber Ducts (Optional) - Alcatel-Lucent 1665 Installation Manual

Data multiplexer
Hide thumbs Also See for 1665:
Table of Contents

Advertisement

Physical installation
............................................................................................................................................................................................................................................................
........................................................................................................................................................................................................................
14
Push the pin until it is completely fastened.
........................................................................................................................................................................................................................
15
Repeat
........................................................................................................................................................................................................................
16
Attach one fiber radius control module to the bottom of each bracket.
........................................................................................................................................................................................................................
17
Position one of the brackets along the right side of shelf 1. Secure with 3 bracket mounting
screws.
........................................................................................................................................................................................................................
18
Repeat
........................................................................................................................................................................................................................
19
Using a label maker, create 16 labels "LS" and 8 labels "HS".
........................................................................................................................................................................................................................
20
Attach the "HS" labels to the uppermost spool on each of the brackets.
........................................................................................................................................................................................................................
21
Attach the "LS" labels to the middle and lower spools on each of the brackets.
........................................................................................................................................................................................................................
22
Check off the appropriate box in
E
O
N D
........................................................................................................................................................

Installing the fiber ducts (optional)

Description
This procedure describes how to install the fiber ducts on either side of the bay. The fiber
ducts may be shipped with the Alcatel-Lucent 1665 DMX.
Note:
extended by at least 2.5 inches beyond the bay upright on each side. This is typically
done using base fillers.
............................................................................................................................................................................................................................................................
Alcatel-Lucent 1665 DMX R9.0
365-372-304R9.0 Issue 2
July 2010
Step 12
through
Step 14
Step 17
for all the other shelves being installed.
S
F
T E P S
If fiber management is to be installed, the width of the bay footprint must be
for all the spools, with three per bracket.
Table I-3, Installation acceptance
Installing the fiber ducts (optional)
checklist.
2 - 2 3

Advertisement

Table of Contents
loading

Table of Contents