Alcatel-Lucent 1665 Installation Manual page 312

Data multiplexer
Hide thumbs Also See for 1665:
Table of Contents

Advertisement

WDMX setup and testing: integration procedures
........................................................................................................................................................................
................................................................................................................................................
12
Connect an OC-48 test set to the PTM in port 1 while observing the proper optical power
levels listed in
................................................................................................................................................
13
Condition the test set to transmit and receive a STS-48 PRBS test signal.
Result:
................................................................................................................................................
14
Inject a single error from the test set.
Result:
................................................................................................................................................
15
Repeat
................................................................................................................................................
16
Remove fiber and LBOs from Port 9 of both LNW705s.
................................................................................................................................................
17
Establish the end to end link on the 10G PTM while observing the proper optical levels
listed in
connecting through the LNW785 go to
LNW785" (p.
................................................................................................................................................
18
Locate and connect the span fibers to the LNW705 while observing the proper optical
levels listed in
................................................................................................................................................
19
Repeat
................................................................................................................................................
20
Observe test set and verify error-free transmission. If only one test set is available, connect
a fiber from the In port to the Out port of the PTM in port 1 at one end. Use the
information listed in
(p. 9-20)
Note:
customer.
........................................................................................................................................................................
9 - 8
Table 9-4, "Attenuation table (pluggable transmission modules)" (p.
Observe error-Free Transmission.
Test set reports the error.
Step 1
to
Step 14
at the other node.
Table 9-4, "Attenuation table (pluggable transmission modules)" (p.
9-9), otherwise continue.
Table 9-4, "Attenuation table (pluggable transmission modules)" (p.
Step 18
at the LNW705 at the other node on the opposite end of the span.
Table 9-4, "Attenuation table (pluggable transmission modules)"
to determine the proper LBO/Attenuator.
Test duration may be determined by engineering specification or by the end
Turn up and test the LNW705 muxponder
Procedure , "Integrating the LNW705 into the
9-20).
9-20). If
9-20).
Alcatel-Lucent 1665 DMX R9.0
365-372-304R9.0 Issue 2
July 2010

Advertisement

Table of Contents
loading

Table of Contents