Ds1 Cleanup Procedures - Alcatel-Lucent 1665 Installation Manual

Data multiplexer
Hide thumbs Also See for 1665:
Table of Contents

Advertisement

Installation tests
............................................................................................................................................................................................................................................................

DS1 cleanup procedures

Delete any existing DS1 cross-connections
Before moving on to the next port to test, it is necessary to remove the cross-connection.
This procedure details the necessary steps to delete a cross-connection.
........................................................................................................................................................................................................................
1
Select Configuration > Cross-Connections...
........................................................................................................................................................................................................................
2
Use the Cross-Connection Wizard to Delete leg(s) of an existing cross-connection
associated with CP main-1, Port 1.
Requirement: The DS1 test set should indicate a blue (AIS) signal is being received
in place of the QRSS signal.
........................................................................................................................................................................................................................
3
Remove the test set connections from the DSX-1.
........................................................................................................................................................................................................................
4
Select Configuration > Update System... > Update All.
Result:
from the DSX-1.
........................................................................................................................................................................................................................
5
Repeat the
terminating equipment transmission testing (optical main OLIU) (p. 6-8)
the
Delete any existing DS1 cross-connections (p. 6-14)
remaining DS1 tributaries of the Function unit. This is necessary in order to ensure that the
cabling of each port address is correct.
The table below lists the tributaries and cross-connections for all DS1s associated with a
function group.
When testing cabling for a Function unit slot other than a, replace the
addresses with the letter (
Table 6-2 DS1 Cross-Connections
............................................................................................................................................................................................................................................................
6 - 1 4
This command will remove alarms generated by removing the test signals
DS1 terminating equipment loopback testing (p. 6-6)
b
c
,
, or
Tributary @ DSX-1
1
2
d
) corresponding to the Function unit slot under test.
Cross-Connection
m1-1-1-1-1,a1-1-1-1
m1-1-1-1-2,a1-1-1-2
DS1 cleanup procedures
or the
DS1 non-
procedure and
procedure to test each of the
a
in each of the
Alcatel-Lucent 1665 DMX R9.0
365-372-304R9.0 Issue 2
July 2010

Advertisement

Table of Contents
loading

Table of Contents