OC-3/12/48 ring setup and testing: integration procedures
........................................................................................................................................................................

Manual switching tests

Description
This test will initiate switching commands from the CIT and verify proper switching and
LED indications.
Note:
Manual switching test procedure
................................................................................................................................................
1
Enter an STS-1 add/drop cross-connection between an equipped Function unit and the
Main OLIU. Select Configuration > Cross-Connections... and use the Cross-Connection
Wizard to enter an add/drop cross-connection.
................................................................................................................................................
2
Select Fault > Protection Switch...
................................................................................................................................................
3
Under Path Protection choose Path m-1-1 and click Select.
................................................................................................................................................
4
Note the Active Path (m1 or m2).
................................................................................................................................................
5
Choose Switch Type: Manual.
................................................................................................................................................
6
Click Apply.
................................................................................................................................................
7
Verify that the Active Path: has changed (m1 to m2 or m2 to m1).
................................................................................................................................................
8
Repeat
................................................................................................................................................
9
Check off the appropriate box in
E
O
N D
........................................................................................................................................................
........................................................................................................................................................................
8 - 1 2
An STS-1 cross-connect is required in order to perform manual switching.
Step 2
through
Step 7
S
F
T E P S
to verify a switch back to the original ring.
Table I-3, Installation acceptance