OC-3/12/48 ring setup and testing: integration procedures
........................................................................................................................................................................
Safety instructions
Note:
Unterminated optical connectors may emit laser radiation. Do not view beam with
optical instruments.

Fiber installation

Description
This section is used to verify proper fiber connections between Alcatel-Lucent 1665 DMX
nodes.
Prerequisite
The following is a list of items to verify before beginning tests in this section.
Two people are required to perform the end-to-end turn up in this section (one at each
adjacent node).
The Alcatel-Lucent 1665 DMX Main OLIUs should be optically looped from the
previous section. Verify that the Alcatel-Lucent 1665 DMX shelf is clear of all alarms
(only green LEDs are lighted) prior to and after completing this test.
CIT is still connected to the Alcatel-Lucent 1665 DMX.
The office alarm cable will remain disconnected during this procedure.
A properly grounded ESD wrist strap MUST be worn when handling circuit packs.
........................................................................................................................................................................
8 - 2
All precautions should be observed when handling fiber.
WARNING
Laser hazard
NOTICE
The operational tests in this section are run only in an out-of-service mode of
operation. Office alarms will normally be connected only during the office
alarm test to prevent constant alarms throughout this section.
CAUTION
ESD hazard
Fiber installation
Alcatel-Lucent 1665 DMX R9.0