Chapter 4
FRU Replacement Workflows
This chapter describes replacement workflows by type of maintenance for FRUs and
the PCI expansion unit mounted to the SPARC M12-2/M12-2S.
See
"Chapter 8 Preparation for
the system configuration to confirm whether there is a fault.
For the installation and removal procedures of each FRU, see
subsequent chapters.
For the replacement procedure for the FRUs mounted in the PCI expansion unit, see
the PCI Expansion Unit for Fujitsu SPARC M12 and Fujitsu M10/SPARC M10 Service
Manual.
Active/Hot Replacement Workflows
■
Active/Cold Replacement Workflows
■
Inactive/Hot Replacement Workflows
■
Inactive/Cold Replacement Workflows
■
System-Stopped/Hot Replacement Workflows
■
System-Stopped/Cold Replacement Workflows
■
4.1
Active/Hot Replacement Workflows
This section describes the workflows for active/hot replacement of the FRUs mounted
in the SPARC M12-2/M12-2S.
Before performing replacement work, be sure to check the notes on maintenance
work in the Fujitsu SPARC M12 Product Notes of the XCP version used.
Each of the following sections puts together the order of work and the tasks for each
FRU into a table. For details on each task, see the reference shown in the table.
The following FRUs are subject to active/hot replacement:
XSCFU
■
PCIe card
■
Maintenance" before starting maintenance. Check
Chapter 11
and
69
Need help?
Do you have a question about the Oracle SPARC M12-2 and is the answer not in the manual?