Table 6-6     Active/Cold Removal Procedure of the CMUU (continued)
Work
Task
Order
5
Releasing the HDD/SSD and PCIe cards
mounted in the SPARC M12-2S requiring
maintenance, from the system
6
Releasing the SPARC M12-2S requiring
maintenance from the physical partition
7
Switching the mode switch on the OPNL
to Service
8
Confirming that the physical partition
and logical domains continue operating
9
Releasing the SPARC M12-2S requiring
maintenance from the building block
configuration
10
Enabling the removal of the CMUU
11
Removing the CMUU from the SPARC
M12-2S
12
Installing a filler unit in the SPARC M12-2S
13
Assembling the SPARC M12-2S from
which the CMUU was removed
14
Incorporating the SPARC M12-2S from
which the CMUU was removed into the
building block configuration
15
Diagnosing the SPARC M12-2S from
which the CMUU was removed (*1)
16
Diagnosing the XBU and crossbar cable,
in the building block configuration, of the
SPARC M12-2S from which the CMUU
was removed
17
Incorporating the SPARC M12-2S into the
physical partition
18
Switching the mode switch on the OPNL
to Locked
19
Checking the operating condition of the
physical partition and logical domains (*2)
20
Saving logical domain configuration
information
*1 If the memory was removed from a SPARC M12-2S with no PCIe cards mounted, no diagnosis is necessary
(because diagnosis was performed in the previous step).
*2 Reconfigure logical domains as required. For details, see "Chapter 3 Operations for Domain Configuration" in
the Fujitsu SPARC M12 and Fujitsu M10/SPARC M10 Domain Configuration Guide.
Reference
"9.4 Enabling the Removal of
"9.4.3 Dynamically Releasing the
SPARC M12-2S From the Physical
Partition"
"2.3.2 OPNL Control
Function"
"9.2.1 Checking the Operation Status of
Physical Partitions and Logical
"9.6.1 Releasing the SPARC M12-2S
From the Building Block
Configuration"
"17.4.1 Enabling the Removal of the
CMU"
"17.4.2 Removing the
CMU"
"17.5.2 Installing the
CMU"
"17.5.3 Restoring the
Server"
"10.4.1 Incorporating the SPARC
M12-2S Into a Building Block
Configuration"
"10.5.1 Diagnosing the SPARC M12
Hardware"
"10.5.2 Diagnosing the XBU and
Crossbar
Cable"
"10.6.1 Incorporating the SPARC
M12-2S Into the Physical Partition Using
PPAR
DR"
"2.3.2 OPNL Control
Function"
"9.2.1 Checking the Operation Status of
Physical Partitions and Logical
"9.1.1 Saving Logical Domain
Configuration
Information"
Chapter 6 FRU Removal Workflows
Hardware"
Domains"
Domains"
197

Advertisement

Table of Contents
loading

This manual is also suitable for:

Oracle sparc m12-2s

Table of Contents