Release the SPARC M12-2S from the building block configuration.
4.
XSCF> initbb -b 2
You are about to initialize BB/XB-Box.
NOTE the following.
1. BB/XB-Box is exclueded from the system and halted.
2. PPAR-ID of the same value as BB-ID becomes invalid.
Continue? [y|n] : y
XSCF>
Check that the LEDs of the released SPARC M12-2S are off.
5.
Wait for the READY, CHECK, and MASTER LEDs on the XSCFU to turn off.
(Approx. 10 minutes)
For the LEDs on the XSCFU, see
Check the status of the building block configuration.
6.
Check that the released SPARC M12-2S is not displayed.
XSCF> showboards -a -v
PSB
R PPAR-ID(LSB) Assignment
---- - ------------ ----------- ---- ---- ---- ------- --------
00-0
00(00)
01-0
00(01)
XSCF>
7.
Disconnect the power cord, crossbar cable, XSCF BB control cable, and XSCF
DUAL control cable.
Disconnect all the cables connected to the locations enclosed in dotted lines.
Note that, when the XSCFU is the slave XSCF, the XSCF DUAL control cable is
not connected.
Figure 9-5     Disconnecting Cables
Power cord
XSCF DUAL
control cable
XSCF BB
control cable
8.
Set the BB-ID of the released SPARC M12-2S.
To release the SPARC M12-2S and use it as another system, set the BB-ID as
appropriate for the system configuration.
Pwr
Conn Conf Test
Assigned
y
y
Assigned
y
y
"Figure
2-11."
Fault
y
Passed
Normal
y
Passed
Normal
Chapter 9 Releasing FRUs From the System
Crossbar cable
319

Advertisement

Table of Contents
loading

This manual is also suitable for:

Oracle sparc m12-2s

Table of Contents