5.1.1
Active/Hot Addition Workflow of a PCIe Card
Before adding the PCIe card, see
Precautions for FRU
Table 5-1
Hot Plug function.
Table 5-1 Active/Hot Addition Procedure of a PCIe Card
Work
Order
1
2
3
4
5
6
7
8
9
5.1.2
Active/Hot Addition Workflow of the HDD/SSD
Before adding the HDD/SSD, see
Precautions for FRU
Table 5-2
152
Fujitsu SPARC M12-2/M12-2S Service Manual ・ January 2023
Expansion."
shows the workflow for active/hot addition of a PCIe card using the PCI
Task
Checking the operating condition of the
system
Switching the mode switch on the OPNL
to Service
Removing the PCICS from the SPARC
M12-2/M12-2S or PCI expansion unit
Removing the PCIe card filler of the PCICS
Installing a PCIe card in the PCICS to
install it in the SPARC M12-2/M12-2S or
PCI expansion unit
Incorporating the added PCIe card into
the system
Confirming that there is no problem with
the added PCIe card
Switching the mode switch on the OPNL
to Locked
Assigning the I/O resource to a logical
domain
Expansion."
shows the workflow for active/hot addition of the HDD/SSD.
"Precautions for PCIe card
Reference
"9.2.1 Checking the Operation Status of
Physical Partitions and Logical
"2.3.2 OPNL Control
"12.3.1 Enabling the Removal of a PCIe
Card"
"12.3.2 Removing a PCIe Card or PCIe
Card
Filler"
"12.4.1 Installing a PCIe Card or PCIe
Card
Filler"
"10.6.2 Incorporating an I/O Device Into
the Physical Partition by Using the Hot
Plug
Function"
"10.5.3 Checking the FRU Status After
Maintenance"
"2.3.2 OPNL Control
"3.2 Operations and Commands Related
to Logical Domain Configurations" in the
Fujitsu SPARC M12 and Fujitsu
M10/SPARC M10 Domain Configuration
Guide
"Precautions for HDD/SSD
addition" in
"7.2
Domains"
Function"
Function"
addition" in
"7.2